Des Moines Prep Campus Improvements
CDA is providing site planning and civil engineering services for the multi-phase redevelopment of the Des Moines Prep campus, coordinating site access, circulation, parking, stormwater management, and phased site improvements.
Improvements to the 1.05-acre west parking lot are designed to streamline parent drop-off and pick-up operations and improve overall campus circulation, supported by a conditional use permit for the parcel. A later phase adds a new two-story, 25,963 SF student commons building with a gymnasium, cafeteria, and offices, along with a 0.98-acre athletic practice field and park amenities, which required rezoning of the property.
Services: Topographic survey, concept and site plan development, preliminary and final design, stormwater management, landscape and tree mitigation planning, limited bid phase services, construction administration and observation.